Rambla del Raval and surrounding area

2019 Barcelona
Vora

The renovation is part of a plan for the south raval neighborhood, and consists of a set of strategies for the improvement of this area of the city. It is a transformation that brings a better appropriation and use of public space by the neighbors, through small strategic interventions.

Vora
Vora
Vora
Vora
Vora
Vora
Vora
Vora
Vora
Vora
Vora
Vora

The renovation area includes the public spaces of the Rambla del Raval, Plaça Vázquez Montalbán and Plaça Salvador Seguí, as well as the areas and streets that are connected to them.

The area has undergone a very significant urban transformation since the approval of the PERI Raval (regeneration plan) in 1985. This process has meant the replacement of a very compact and socially degraded part of the city by another one that, even with the unquestionable improvements it has undergone, still had significant dysfunctions.

An open transformation strategy has been put in place, through small interventions that allow a balanced appropriation by the neighbors. A powerful transformation in spirit but light in form, without extensive infrastructural works, demolitions, etc.

This strategy is focused on improving 3 qualities of the space:

Permeability:

To reinforce the current routes, making them more visible.
Undoing the linearity of the Rambla del Raval,
permeabilizing its transversality, strengthening the transition between spaces in the transversal routes, mainly Salvador Seguí – Vázquez Montalbán – Rambla – Folch i Torres axis.

Comfort:
To make using and enjoying more convenient and comfortable.
Removing physical barriers, laying soft pavements, adding shade, modifying furniture to generate living and meeting spaces, providing Vázquez Montalbán square with identity and comfort.

Utilization:
To provide infrastructures and lay the foundations to motivate new activities in the public space.
Rebalancing, avoiding segregation, activating unused spaces, fulfilling unmet needs (children, youth and adults), rearranging the terraces to optimize their occupancy in the public space, less intrusive, and more inviting.

ADDRESS: RAMBLA DEL RAVAL, (PLAÇA VÁZQUEZ MONTALBÁN, PLAÇA SALVADOR SEGUÍ)
STRATEGIC PLAN: 2016-2017
PROJECT: 2017-2018
CONSTRUCTION: 2019-2020

ARCHITECTS: VORA (WITH TONI RIBA)
TEAM: ALEX ETXEBERRÍA, POL BOSCH, ZOÍ CASIMIRO, MOHAMED EL-JAANIN, LORENZ KRAUTH, QUIM OLEA, MARINA PINA, ANDREA SALVADOR
ENGINEERING: PRODOP
STRUCTURE: UMA
BUDGET: ROSA ROMERO
AGRONOMY: ROSER VIVES
LIGHTNING: ANOCHE
CONSTRUCTION DIRECTION: PCG
CLIENT: FOMENT DE CIUTAT – BIMSA – (COUNCIL OF BARCELONA)
PHOTOS: ADRIÀ GOULA